A more prepared move
An office relocation succeeds when transport is connected to business readiness. Use this office relocation checklist to plan for furniture, equipment, people and access, then assign an owner to each dependency. Our physical moving work is only one part of the relocation.
Create an inventory by department or destination zone. Separate furniture, workstations, shared equipment, records, supplies and items being retired. Mark leased equipment and ask the relevant vendor about relocation conditions before including it in the moving scope.
Use the new floor plan to decide where each item belongs. A simple room or workstation code should appear on the plan, item label and inventory. If the layout is still changing, keep the version controlled so we are not working from an outdated destination list.
Obtain loading-dock, freight-elevator and service-entrance instructions from both property managers. Confirm vehicle dimensions, access windows, protection requirements and any documents requested from us. Ask who is authorized to open the loading area outside ordinary business activity.
Identify items that do not fit the normal route and request a separate assessment. A boardroom table, safe, large copier or server cabinet should not be treated as an ordinary desk without measurements and handling review. Building permission and our capability both need confirmation.
Assign qualified internal staff or vendors to backups, shutdown, disconnection, network readiness and recommissioning. We must know when equipment is released for transport, but physical moving does not imply data migration, cabling, network engineering or secure destruction.
Set a handover point between the technical owner and the moving team. Record the equipment list, packaging status and destination. At the new office, the technical owner should decide when equipment is ready to power on and who verifies functionality.
If essential operations must continue, add each phase to the office relocation checklist. Identify which teams or equipment can move together and what must stay available. Ask us to assess the proposed sequence and any after-hours work rather than assuming continuous availability.
Each phase needs a collection list, destination, access window and sign-off owner. Avoid moving a shared resource before the remaining team has an agreed alternative. A transport schedule should be tested against the business’s actual dependency list.
Assign a name and due date to each item. Keep outstanding decisions visible rather than marking a task complete when it has only been requested.
Physical delivery, furniture placement, assembly and operational readiness are different milestones. State which we are responsible for and how they will be checked. Keep any excluded tasks visible so they can be assigned to another party.
At handover, reconcile labelled items and record damage, shortages or placement exceptions through the agreed process. The business should separately confirm IT function, safety, access and readiness for staff. We assess the inventory, schedule and requested services when reviewing your office move.
Does office moving include reconnecting computers?
Only if a clearly defined service is separately agreed with a capable party. Physical transport should not be assumed to include network or system work.
Can the office move in stages?
You can request a phased plan. Provide the inventory, building windows, business dependencies and receiving contacts for each phase so we can assess it.
When is the move complete?
Define that in the scope. Delivery, placement, assembly and business readiness are separate milestones and may have different responsible parties.
Send your contact details, starting and destination postal codes, and move type. We’ll review your request and confirm availability, the estimate and booking terms.